Landfill, Cell & Sidewall Construction -
Sir Frederick Snow & Partners Ltd has been involved with various
landfill projects providing studies, technical advice, design, supervision
and construction quality assurance (CQA).
Avondale Landfill
Supervision and CQA of base and sidewall construction, capping and road
access works. Current project 10 cells to date.
Levenseat Landfill
Preparation of PPC application
Peckfield Quarry
Landfill (below)
Supervision, certification and design of a landfill
site in quarry, using HDPE liner and construction methods to
satisfy the Waste Management Committee and the NRA (Environment Agency).
Completed 2005.
Peckfield
Landfill Cells 1 & 2, 4 & 5
(below)
Review commentary and costing for twelve sidewall solutions. Provision
of alternative approved cost effective designs.
Design of vertical clay face solution which has been vetted and
confirmed by independent
engineers.


Greengairs Landfill
(right)
Supervision and CQA of cell and capping construction was carried out by
the Company
Hartlouphill
Cell and sidewall contract and CQA.
Astbury Landfill
Supervision and CQA of sidewall construction, capping and road access
works.
Penn-y-bont
Supervision and CQA of base and sidewall construction, capping and road
access works.
Withnell Landfill
Review of existing design and all CQA.
Clifton Hall Landfill
Cell and sidewall contract and CQA
Deerplay Landfill (right)
Having previously made a review of existing designs and
proposals for extension for Sidewall Appraisals the
Company provided lagoon, cell construction design and CQA for Deerplay
landfill (right).
Highmoor Quarry Landfill
CQA to cell construction and vertical sidewall liner.
Site in North West
For Biffa Waste Services Ltd. a site apparaisal for phasing of cell
construction and rock extraction was provided.
Meadowhall Landfill, Rotherham
Studies, technical advice, contract documentation, cost estimations and
supervision of quality control for landfill cell construction and capping.
Following this an approved and applied design of stepped sidewall solution.
Scabba
Wood Landfill and Sidewall Appraisal
CQA to sidewall preparation works and report on existing construction and options for extensions. Costing of
alternatives (including Tipform) and consideration of suitability and
construction options.
Howden
Clough Beck Diversion
Technical advice, studies, contract documentation and project
supervision of landfill construction and beck diversion also including
environmental landscaping.
Three
Sites in North West
Three site investigations with borehole and material properties testing.
Waterhall
Quarry Landfill
Design of steep clay sidewall
Tytherington
Engaged as sub-consultants to advise on revetment and sidewall solutions
Sidewall
Developments
Assistance in the development of new design of galvanized sidewall
panels.