UPGRADE OF CHEDDI JAGEN AIRPORT

 

Location – GUYANA

DATE – 2004-Current

PROJECT VALUE – at least £5M

In September 2004, Sir Frederick Snow and Partners Ltd were appointed by the Ministry of Public Works and Communication of the Government of Guyana to carry out a Feasibility Study and Detailed Design of the preferred option. Tender Documents were produced including full Specifications.
The existing configuration of the apron enables four aircraft to be parked nose-in. It was requested that two more nose-in stands could be provided. It was also identified that there was considerable fuel erosion on the apron, which combined with drainage problems was presenting serious problems for aircraft operations. After much discussion a preferred scheme was developed in tandem with a do-minimum scheme. Currently monies are being secured from the Inter American Development Bank for the Construction Phase.

In addition to the visual surveys, Core Tests, Trial Pits and a GPR (Ground Penetrating Radar) Survey were carried out to gain a further understanding of the prevailing conditions. A locally arranged Topographical Survey assisted the preparation of the Apron Design.

 